I am coating a piece weighing about 40lbs and with thick walls ( 10ga or .135 or heavy 1/8"). I just timed the bare piece to get to 375 degrees at 30 minutes from cold (45degrees).
Should I start my cure time from the 30 minute mark or will it already be cured?
Possibly lower temp cure with longer cure time?
The part gets to 200 in about 15 minutes...
I am looking for suggestions.
Thanx