For the guys who do production work, what should I charge to do around 120 pieces every month or two of 6' long 4" dia heavy-wall steel pipe in Industrial Safety Yellow for protective bollards? I can probably rack 9 at a time for curing on my oven rack, but I'd still have to shoot them one at a time and hang on the rack as they're coated. Prep would involve wiping down with degreaser and using one-step phoshate pre-treat that doesn't require a rinse.
Thanks in advance.
Thanks in advance.
Comment